Washington state public utility signs PPA for 260-MW solar + storage project
AI Analysis
Summary
<p>Clearway Energy Group announced that it signed a 20-year PPA and a 20-year energy storage agreement with the Public Utility District No. 2 of Grant County for the Royal Slope Energy Center, a 260-MW solar and 260-MW storage facility in Grant County, Washington. “This partnership with Grant PUD reflects our shared vision to bring reliability…</p> <p>The post <a href="https://www.solarpowerworldonline.com/2025/11/washington-state-public-utility-signs-ppa-for-260-mw-solar-storage-project/">Washington state public utility signs PPA for 260-MW solar + storage project</a> appeared first on <a href="https://www.solarpowerworldonline.com">Solar Power World</a>.</p>
<p>Clearway Energy Group announced that it signed a 20-year PPA and a 20-year energy storage agreement with the Public Utility District No. 2 of Grant County for the Royal Slope Energy Center, a 260-MW solar and 260-MW storage facility in Grant County, Washington. “This partnership with Grant PUD reflects our shared vision to bring reliability…</p>
<p>The post <a href="https://www.solarpowerworldonline.com/2025/11/washington-state-public-utility-signs-ppa-for-260-mw-solar-storage-project/">Washington state public utility signs PPA for 260-MW solar + storage project</a> appeared first on <a href="https://www.solarpowerworldonline.com">Solar Power World</a>.</p>