British football club tenders solar-plus-storage system
AI Analysis
Summary
A football club based in Oldham, Greater Manchester, has opened a tender for the supply and installation of a 80 kW solar array alongside 40 kW of battery storage. The deadline for applications is November 30.
<p class="p1"><span class="s1">A football club based in Oldham, Greater Manchester, has opened a tender for the supply and installation of a 80 kW solar array alongside 40 kW of battery storage. The deadline for applications is November 30.</span></p><p><span style="font-weight: 400;">Greater Manchester-based Avro football club is searching for a contractor to supply and install a solar-plus-battery storage system.</span></p>
<p><span style="font-weight: 400;"><a href="https://www.avrofc.co.uk/solar-panel-installation-project/" rel="noopener" target="_blank">Available tender details</a> state the selected contractor will be required to provide a complete turnkey solution comprising a 80 kW solar array and 40 kW battery storage system. The system will be installed at Vestacare Stadium, located in the town of Oldham, which is home to the football club.</span></p>
<p><span style="font-weight: 400;">Other responsibilities will include full design, engineering and installation services, connection to existing electrical infrastructure and testing, commissioning and handover.</span></p>
<p><span style="font-weight: 400;">Avro FC says interested contractors must demonstrate relevant experience in commercial solar installations as part of their application. The deadline to submit bids is set as November 30.</span></p>