18 California legislators ask CPUC to address solar interconnection delays

November 26, 2025 at 7:31 PM
Kelsey Misbrener
Solar Power World Solar_Industry PV Modules renewables_storage climate_policy_analysis ✓ Processed US_FOCUS_GLOBAL

AI Analysis

Relevance Score: 0.85/1.0

Summary

<p>Eighteen California legislators submitted a joint letter on November 25 to the California Public Utilities Commission (CPUC) regarding delays to turn on customer-owned solar and storage at the state’s two largest utilities. The letter urges the CPUC to hold Pacific Gas &#38; Electric (PG&#38;E) and Southern California Edison (SCE) accountable for repeatedly missing state-mandated timelines.&#8230;</p> <p>The post <a href="https://www.solarpowerworldonline.com/2025/11/18-california-legislators-ask-cpuc-to-address-solar-interconnection-delays/">18 California legislators ask CPUC to address solar interconnection delays</a> appeared first on <a href="https://www.solarpowerworldonline.com">Solar Power World</a>.</p>

<p>Eighteen California legislators submitted a joint letter on November 25 to the California Public Utilities Commission (CPUC) regarding delays to turn on customer-owned solar and storage at the state’s two largest utilities. The letter urges the CPUC to hold Pacific Gas &#38; Electric (PG&#38;E) and Southern California Edison (SCE) accountable for repeatedly missing state-mandated timelines.&#8230;</p>
<p>The post <a href="https://www.solarpowerworldonline.com/2025/11/18-california-legislators-ask-cpuc-to-address-solar-interconnection-delays/">18 California legislators ask CPUC to address solar interconnection delays</a> appeared first on <a href="https://www.solarpowerworldonline.com">Solar Power World</a>.</p>

📝 RSS Summary Only
Tags: News Policy
RSS Categories: News
Collected 1 month, 2 weeks ago
View Original Article