Pace Digitek secures 250 MW of solar and 1.1 GWh of storage in India

February 11, 2026 at 2:25 PM
Uma Gupta
PV Magazine (International) Solar_Renewables PV Modules ✓ Processed

Summary

Karnataka Renewable Energy Development Ltd. (KREDL)) has issued a letter of award to Pace Digitek for a 250 MW solar project with a 250 MW, 1.1 GWh battery energy storage system (BESS) at Pavagada Solar Park in Karnataka, India, with an interim tariff of INR 5.51 ($0.061)/kWh adopted by the Karnataka Electricity Regulatory Commission.

<p class="p1"><span class="s1">Karnataka Renewable Energy Development Ltd. (KREDL)) has issued a letter of award to Pace Digitek for a 250 MW solar project with a 250 MW, 1.1 GWh battery energy storage system (BESS) at Pavagada Solar Park in Karnataka, India, with an interim tariff of INR 5.51 ($0.061)/kWh adopted by the Karnataka Electricity Regulatory Commission.</span></p><p><strong>From <a href="https://www.pv-magazine-india.com/2026/02/11/pace-digitek-secures-250-mw-solar-plus-1-1-gwh-bess-project-from-kredl/" rel="noopener" target="_blank">pv magazine India</a></strong></p>
<div class="flex flex-col text-sm pb-25">
<article class="text-token-text-primary w-full focus:outline-none [--shadow-height:45px] has-data-writing-block:pointer-events-none has-data-writing-block:-mt-(--shadow-height) has-data-writing-block:pt-(--shadow-height) [&amp;:has([data-writing-block])&gt;*]:pointer-events-auto scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]" dir="auto">
<div class="text-base my-auto mx-auto pb-10 [--thread-content-margin:--spacing(4)] @w-sm/main:[--thread-content-margin:--spacing(6)] @w-lg/main:[--thread-content-margin:--spacing(16)] px-(--thread-content-margin)">
<div class="[--thread-content-max-width:40rem] @w-lg/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn">
<div class="flex max-w-full flex-col grow">
<div class="min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal [.text-message+&amp;]:mt-1" dir="auto">
<div class="flex w-full flex-col gap-1 empty:hidden first:pt-[1px]">
<div class="markdown prose dark:prose-invert w-full wrap-break-word light markdown-new-styling">
<p>Pace Digitek has received a letter of award (LoA) from KREDL to develop a 250 MW solar project integrated with a 250 MW, 1,100 MWh battery energy storage system (BESS) at Ryapte in Pavagada Solar Park, Karnataka.</p>
<p>The project, valued at INR 17,750 million, was awarded through a tariff-based competitive bidding process. It is intended to supply peak power and support grid optimization in the state. The Karnataka Electricity Regulatory Commission (KERC) has adopted an interim tariff of INR 5.51/kWh and approved viability gap funding.</p>
<p>Pace Digitek said the project is scheduled for commissioning within 18 months of signing the power purchase agreement.</p>
<p>Following the award, the company’s total consolidated order book stands at INR 102,428 million. This includes INR 77,792 million in the energy segment, spanning solar engineering, procurement and construction (EPC), standalone BESS, solar-plus-storage and balance-of-system projects, and INR 24,637 million in the telecom segment, covering tower infrastructure EPC, operation and maintenance, and telecom power equipment supply.</p>
<p>The 250 MW, 1,100 MWh project increases Pace Digitek’s total BESS order book to more than 5 GWh.</p>
<p>“This win is a testament to Pace Digitek’s evolving capabilities in delivering large-scale, integrated renewable energy and storage solutions,” said Venugopal Rao Maddisetty, chairman and managing director of Pace Digitek. “By combining 250 MW of solar power with a massive 1.1 GWh battery energy storage system, the project increases Pace Digitek’s total BESS order book portfolio to over 5 GWh, while enabling the delivery of dispatchable, peak-hour power aligned with long-term grid stability requirements in Karnataka.”</p>
<p>He added that the project will incorporate a minimum of 20% local content, including the company’s indigenously developed energy management system (EMS) software.</p>
</div>
</div>
</div>
</div>
<div class="z-0 flex min-h-[46px] justify-start"></div>
<div class="mt-3 w-full empty:hidden">
<div class="text-center"></div>
</div>
</div>
</div>
</article>
</div>
<div class="pointer-events-none h-px w-px absolute bottom-0"></div>

📝 RSS Summary Only
Tags: Markets Karnataka Renewable Energy Development Markets & Policy Energy Storage Pace Digitek
RSS Categories: Energy Storage
Collected 2 weeks, 3 days ago
View Original Article