Bexar BESS achieves NERC registration in ERCOT

July 07, 2026 at 12:47 PM
Kelly Pickerel
Solar Power World Solar_Industry PV Modules ✓ Processed US_FOCUS_GLOBAL

Summary

<p>The 100-MW Bexar Battery Energy Storage System, developed by Goshe Energy Storage, has reached commercial operations and NERC registration in Bexar County, Texas. As a facility exceeding the 75-MVA threshold, Bexar BESS was required to register as a NERC Category 1 Generation Owner (GO). Radian Generation partnered closely with Goshe Energy Storage during the final&#8230;</p> <p>The post <a href="https://www.solarpowerworldonline.com/2026/07/bexar-bess-achieves-nerc-registration-in-ercot/">Bexar BESS achieves NERC registration in ERCOT</a> appeared first on <a href="https://www.solarpowerworldonline.com">Solar Power World</a>.</p>

<p>The 100-MW Bexar Battery Energy Storage System, developed by Goshe Energy Storage, has reached commercial operations and NERC registration in Bexar County, Texas. As a facility exceeding the 75-MVA threshold, Bexar BESS was required to register as a NERC Category 1 Generation Owner (GO). Radian Generation partnered closely with Goshe Energy Storage during the final&#8230;</p>
<p>The post <a href="https://www.solarpowerworldonline.com/2026/07/bexar-bess-achieves-nerc-registration-in-ercot/">Bexar BESS achieves NERC registration in ERCOT</a> appeared first on <a href="https://www.solarpowerworldonline.com">Solar Power World</a>.</p>

📝 RSS Summary Only
Tags: Batteries and Storage News Storage Texas
RSS Categories: Batteries and Storage
Collected 6 days, 16 hours ago
View Original Article