This huge Texas solar hub is nearly 1 GW, and it’s only half built

July 31, 2026 at 7:14 PM
Michelle Lewis

AI Analysis

Relevance Score: 1.00/1.0

Summary

<div class="feat-image"><img src="https://electrek.co/wp-content/uploads/sites/3/2026/07/OE_PR_Rockhound-COD_2026-07_Header-scaled-1.jpg?quality=82&#038;strip=all&#038;w=1600" /></div><p class="wp-block-paragraph">Renewable energy developer Origis Energy has brought another 500 megawatts (MWdc) of solar online at its Rockhound complex in West Texas, pushing the sprawling project’s operating capacity to nearly 1 gigawatt (GW).</p>

<div class="feat-image"><img src="https://electrek.co/wp-content/uploads/sites/3/2026/07/OE_PR_Rockhound-COD_2026-07_Header-scaled-1.jpg?quality=82&#038;strip=all&#038;w=1600" /></div><p class="wp-block-paragraph">Renewable energy developer Origis Energy has brought another 500 megawatts (MWdc) of solar online at its Rockhound complex in West Texas, pushing the sprawling project’s operating capacity to nearly 1 gigawatt (GW).</p>

📝 RSS Summary Only
Tags: News
RSS Categories: News
Collected 1 month, 1 week ago
View Original Article