Tesla files for $10.1B ‘Project Crystal Sun’ solar factory in Texas

August 11, 2026 at 4:14 PM
Fred Lambert

AI Analysis

Relevance Score: 1.00/1.0

Summary

<div class="feat-image"><img src="https://electrek.co/wp-content/uploads/sites/3/2024/09/Tesla-Solar-Panel-installation-pricing.jpg?quality=82&#038;strip=all&#038;w=1499" /></div><p class="wp-block-paragraph">Tesla has filed for a $10.1 billion solar cell factory in Fort Bend County, Texas, under the codename “Project Crystal Sun,” according to a tax-incentive application posted by the Texas Comptroller.</p> <p class="wp-block-paragraph">The filing pegs the plant at 9,712 permanent jobs, roughly 3,050 acres near Richmond, and commercial production starting in the first quarter of 2029. It’s the largest US manufacturing investment Tesla has ever put on paper.</p>

<div class="feat-image"><img src="https://electrek.co/wp-content/uploads/sites/3/2024/09/Tesla-Solar-Panel-installation-pricing.jpg?quality=82&#038;strip=all&#038;w=1499" /></div><p class="wp-block-paragraph">Tesla has filed for a $10.1 billion solar cell factory in Fort Bend County, Texas, under the codename “Project Crystal Sun,” according to a tax-incentive application posted by the Texas Comptroller.</p>
<p class="wp-block-paragraph">The filing pegs the plant at 9,712 permanent jobs, roughly 3,050 acres near Richmond, and commercial production starting in the first quarter of 2029. It’s the largest US manufacturing investment Tesla has ever put on paper.</p>

📝 RSS Summary Only
Tags: Tesla Energy texas concentrated solar power Solar News Tesla solar Tesla
RSS Categories: News
Collected 1 month ago
View Original Article