Xinjiang’s Fresnel CSP starts operation pioneering multiple O&M automation innovations
<p>Source: China Solar Thermal Alliance On September 18, the 100 MW CSP plant of the CTGR Hami 1 GW “CSP + PV” integrated demonstration project—general-contracted by Northwest Electric Power Design Institute Co., LTD, of China Power Engineering Consulting Group(CPECC Northwest), the executive vice-chairman unit of the CSTA—achieved full-system grid connection, marking the full completion of […]</p> <p>The post <a href="https://www.solarpaces.org/xinjiangs-fresnel-csp-starts-operation-pioneering-multiple-om-automation-innovations/">Xinjiang’s Fresnel CSP starts operation pioneering multiple O&M automation innovations</a> appeared first on <a href="https://www.solarpaces.org">SolarPACES</a>.</p>